Date/WeekDescription
01/07/2007Removing Deck and Digging Foundation
01/08/2007 - 01/20/2007Prep, Concrete and Building the Foundation
02/24/2007Building first floor, removing bay window
03/03/2007Building first floor walls, installing beam
03/10/2007Installing second floor and getting tub to second floor
03/17/2007Installing second floor walls
03/24/2007Trusses and roof plywood
03/31/2007Shingles and windows
04/07/2007Mechanicsville Blizzard
04/14/2007Remaining windows and doors, finished roof
04/21/2007House wrap, siding and window trim
04/28/2007Remove bathroom, tie into second story from the inside
05/05/2007Siding, frame new bath, extend old bath, hallway
05/12/2007Siding and interior 2nd floor framing
05/19/2007Siding and more siding
05/26/2007One side complete, two more to go
06/02/2007One more side complete, one more to go
06/09/2007Painted one side, soffets complete
06/16/2007Painted another side, caulking, french doors
06/23/2007Insulation, more painting
06/30/2007Drywall
07/21/2007Gutters
07/29/2007Priming
08/03/2007Interior and Exterior Painting
08/11/2007More priming and painting
08/18/2007Installing doors and jambs
08/25/2007Installing window jamb extensions
09/02/2007Installing window sills
09/09/2007Installing baseboard and casing
09/15/2007Starting deck and finishing trench
09/22/2007Building deck
09/30/2007Hall Bath, Baseboard, window casing
10/06/2007Building deck steps
10/13/2007Remodeling old Master bedroom
11/04/2007Old bedroom trim, hall bath, and attic insulation
Final interior pictures will be posted in January 2008

After the addition
(Upstairs: new master bedroom, master bath, renovated old master bedroom, renovated guest bath
downstairs: Extended kitchen, new family room)
Back to Top