| Date/Week | Description |
| 01/07/2007 | Removing Deck and Digging Foundation |
| 01/08/2007 - 01/20/2007 | Prep, Concrete and Building the Foundation |
| 02/24/2007 | Building first floor, removing bay window |
| 03/03/2007 | Building first floor walls, installing beam |
| 03/10/2007 | Installing second floor and getting tub to second floor |
| 03/17/2007 | Installing second floor walls |
| 03/24/2007 | Trusses and roof plywood |
| 03/31/2007 | Shingles and windows |
| 04/07/2007 | Mechanicsville Blizzard |
| 04/14/2007 | Remaining windows and doors, finished roof |
| 04/21/2007 | House wrap, siding and window trim |
| 04/28/2007 | Remove bathroom, tie into second story from the inside |
| 05/05/2007 | Siding, frame new bath, extend old bath, hallway |
| 05/12/2007 | Siding and interior 2nd floor framing |
| 05/19/2007 | Siding and more siding |
| 05/26/2007 | One side complete, two more to go |
| 06/02/2007 | One more side complete, one more to go |
| 06/09/2007 | Painted one side, soffets complete |
| 06/16/2007 | Painted another side, caulking, french doors |
| 06/23/2007 | Insulation, more painting |
| 06/30/2007 | Drywall |
| 07/21/2007 | Gutters |
| 07/29/2007 | Priming |
| 08/03/2007 | Interior and Exterior Painting |
| 08/11/2007 | More priming and painting |
| 08/18/2007 | Installing doors and jambs |
| 08/25/2007 | Installing window jamb extensions |
| 09/02/2007 | Installing window sills |
| 09/09/2007 | Installing baseboard and casing |
| 09/15/2007 | Starting deck and finishing trench |
| 09/22/2007 | Building deck |
| 09/30/2007 | Hall Bath, Baseboard, window casing |
| 10/06/2007 | Building deck steps |
| 10/13/2007 | Remodeling old Master bedroom |
| 11/04/2007 | Old bedroom trim, hall bath, and attic insulation |
| Final interior pictures will be posted in January 2008 |